ardaman-and-associates-inc-white view-blog helpful-resources about-ardaman desktop print download check close search-plus plus-square search-minus home clock-o list-alt lock times-circle check-circle check-circle-o question-circle info-circle arrow-left arrow-right arrow-up arrow-down plus minus calendar chevron-up chevron-down clipboard thumbs-o-up thumbs-o-down phone twitter facebook certificate arrow-circle-left arrow-circle-right arrow-circle-up arrow-circle-down bars list-ul google-plus caret-down caret-up caret-left caret-right envelope user-secret shield linkedin angle-double-left angle-double-right angle-double-up angle-double-down laptop tablet mobile calendar-o chevron-circle-left chevron-circle-right chevron-circle-up chevron-circle-down level-up level-down thumbs-up thumbs-down minus-square check-square youtube-square youtube file-pdf-o leave-a-review compass building-o bubbles bubbles2 bubbles3 bubbles4 building checklist comments comments-o user users arrow-up-left arrow-up2 arrow-up-right arrow-right2 arrow-down-right arrow-down2 arrow-down-left arrow-left2 thumbs-up2 thumbs-up3

Portfolio: Bulkhead Wall

  • Bulkhead Wall Examples
  • Bulkhead-Wall-2 Examples
  • Bulkhead-Wall Examples

Bulkhead Wall

Tampa

Ardaman provided the geotechnical engineering parameters for the engineering design of the bulkhead wall at Berth 213 in the Port of Tampa.  Ardaman also developed procedures for placement of clayey, poor quality fill to maximize the use of this fill and minimize the need for imported clean fill.  Fill was placed by bulldozers from the land side, using a “Mud-Wave” technique to limit the segregation of the clay from the fill as it was placed through water.

When the loose fill began to push on the wall, tie-backs were installed behind the wall, and imported clean sand fill was brought in to complete the wall backfill.  Vibro-beam densification was performed in the deeper fill section to increase the density of the soils placed in this area.

Mini-Cone and Pore-pressure Cone Penetrometer tests were conducted in the completed fill after vibro-beam densification to determine when the deeper soils were dense enough to complete the fill to grade.